The essence of the project control is condensed in the curves that produces
The project control is the ability to know how to interpret.
The project control is the ability to know how to interpret.
The final balance curves, both of detail that overall, have a strange perfection that you can not find in the planned curves derived from reticulate programs.
This is because by the reticular programs will normally take the curve early (impossible but which stimulates) or do a mathematical mediation with the late, although you level resources is improved but not enough
With our program we try to make things as close to reality in a simple and fast.
It was made the choice not to use the program to do the graphics to keep costs down and Excel does so in admirable fashion.
Under the Offer, programming or reprogramming
They take data from the reticular program are worn over Excel after which the data can be processed by scm_CURVE.Processing: | Mediation between the Early and Late Late (where you see fit) going to approach one or the other depending on the time or the expected yields |
Leveling the discipline curve to give it a more natural course | |
Leveling Overall curve and consistency checks between the various disciplines | |
Advancement: | of the forecast calculation (4 different types of calculation) |
Verify the feasibility of the resulting curve back from percentage to the resources needed to achieve the 100% |
Do not underestimate that we are in possession of sources so we can insert options to existing curves or new Utility.
To try it out, download the demo (about 20 Mb) that requires no installation, therefore you can load on any Windows PC albeit with business blocks, or load it on USB stick and run the program. Download
Limitations of Demo:
The downloaded Demo is no serial program. Do not allow the copy of the results for return to Excel, all of the functionality to verify the use and potential can be used, also they contain curves Test to make quick training and experimentation. indented curve |
|
quickly arranged with the mouse |
|
average curve closer to late beginning and early at the end | 4 type of forecast |
| Incidence of a discipline on the total curve |
Comparison of three curves